7169 No. 9 Rd. Richmond, BC, CA
Tel: 236-777-4020
©SunandSteelSolutions2026
The Sun & Steel 100′ Commercial High Tunnel Greenhouse comes in two models to suit any operation. Both feature 6-foot sidewall clearance, dual 8’6″ vehicle-access sliding doors on both ends, full-length 6-foot roll-up vents, insect mesh ventilation, and 6-mil UV-stabilized poly film on a galvanized steel frame.
The Standard Model delivers proven commercial performance with 21 arches at 5 ft on centre — reliable, cost-effective, and built to outperform. The Heavy Model pushes further with 26 arches at 4 ft on centre, 2.5 mm arch walls, a three-tier W-support truss on every arch, and heavier pipe diameters throughout — built for the toughest climates and highest-demand operations.
$9,999.00 – $14,999.00Price range: $9,999.00 through $14,999.00
————————————————————————
Heavy Model: FEATURES
————————————————————————
✔ 21 fully trussed arches — one truss per arch — spaced 5 ft apart for maximum structural strength
✔ 6-foot sidewall clearance for easy equipment operation and worker comfort
✔ Dual 8’6″ sliding vehicle doors on both ends (2 per end, 4 total) — large enough for tractors and forklifts
✔ 6-foot roll-up vent system running the full length of both sides for superior airflow
✔ Insect mesh on both sides (100×10′ per roll) — blocks pests and seeds while maintaining ventilation
✔ 6-mil UV-stabilized poly film — main roof, roller side panels, lower panels, and end panels all included
✔ Wiggle-wire poly channel system for fast, tool-free cover installation and replacement
✔ Heavy-gauge galvanized steel throughout — foundation pipes anchor as solidly as concrete
✔ Wind pipes on both end walls to resist lateral wind loads on the gable ends
✔ Manual roll-up side vent rollers with stop-action levers for adjustable ventilation control
✔ Ground ties included for anchoring in high-wind or exposed locations
✔ Ships in a single heavy-duty crate (6.1m x 1.6m x 1.6m, approx. 3 tonnes)
————————————————————————
Standard Model: SPECIFICATIONS
————————————————————————
Overall Length: 100 ft (approx. 30.5 m)
Number of Arches: 21, spaced 5 ft on centre
Sidewall Clearance: 6 ft (approx. 1,829 mm)
Door Size (per panel): 2,400 mm H x 1,200 mm W (8’6″ x 4′)
Door Configuration: Dual sliding doors on both ends — 4 doors total
Side Vent Height: 6 ft roll-up, full length both sides
Insect Mesh: 0.5 mm mesh, 100×10′, 2 rolls
Frame Material: Galvanized steel pipe
Main Arch Pipe: 60 mm dia. | 2.0 mm wall | 6,700 mm long
Foundation Pipe: 48 mm dia. | 1.5 mm wall | 1,200 mm long
Poly Film: 6-mil UV-stabilized | Main cover 100×60′ plus side, lower & end pieces
Shipping Crate: 6.1 m L x 1.6 m W x 1.6 m H | approx. 3 tonnes
————————————————————————
INCLUDED COMPONENTS
————————————————————————
1. Foundations — Qty: 42
Ground-anchor pipes, as strong as concrete and easy to install
1,200 mm L | 48 mm dia. | 1.5 mm wall
2. Arches — Qty: 21
Main structural arches holding the entire frame together, spaced 5 ft apart
6,700 mm L | 60 mm dia. | 2.0 mm wall
3. Ridges — Qty: 35
Longitudinal pipes that connect and align the arches at the peak
6,096 mm L | 42 mm dia. | 1.5 mm wall
4. Beams — Qty: 19
Transfer structural load from the arches down to the foundation pipes
6,500 mm L | 48 mm dia. | 1.5 mm wall
5. “W” Supports (L) — Qty: 38
Long diagonal supports connecting the arch peak to the beams, forming the truss
1,500 mm L | 32 mm dia. | 1.5 mm wall
6. “W” Supports (M) — Qty: 38
Short diagonal supports connecting the ridge of each arch to the truss system
1,200 mm L | 32 mm dia. | 1.5 mm wall
7. Poly Pipes — Qty: 10
Used with rollers and clips to roll up the side vent poly panels
6,096 mm L | 25 mm dia. | 1.5 mm wall
8. Wall Beams (L) — Qty: 4
Longest wall beam, also used for door frame construction
4,800 mm L | 48 mm dia. | 1.5 mm wall
9. Wall Beams (M) — Qty: 4
Structural sidewall framing and poly channel support
4,200 mm L | 60 mm dia. | 1.5 mm wall
10. Wall Beams (S) — Qty: 4
Short wall beams for lower sidewall framing
3,000 mm L | 60 mm dia. | 1.5 mm wall
11. Wind Pipes — Qty: 4
End-wall bracing pipes that resist lateral wind load on the gable ends
5,000 mm L | 48 mm dia. | 1.5 mm wall
12. Sliding Doors — Qty: 4
Dual sliding doors on both ends, 8’6″ tall and wide enough for vehicles
2,400 mm H | 1,200 mm W | 1.5 mm wall
13. Door Tracks — Qty: 4
Holds the sliding doors in position and guides them to open smoothly
5,000 mm L | 48 mm dia. | 1.5 mm wall
14. 6M “Poly” Film — Qty: 5 pieces
6-mil UV-stabilized poly film covering
Main roof: 100×60′ | Roller sides: 100×8′ (x2) | Lower: 100×2′ (x2) | Ends: 20×35′ (x2)
15. Poly Channels — Qty: 35
Frame-mounted channels that hold the poly film in place with wiggle wire
2,400 mm L | 48 mm dia. | 1.5 mm wall
16. Channel Connectors — Qty: 40
Connects two poly channel sections end-to-end
80 mm L | 6 mm dia. | 1.5 mm wall
17. Wiggle Wire — Qty: 40
Spring-lock wire that secures poly film inside the channels
2,400 mm L
18. Insect Net — Qty: 2
Fine mesh netting that blocks pests and seeds while allowing full airflow
100×10′ | 0.5 mm mesh
19. Standard Rollers — Qty: 4
Manual roll-up side vent rollers with stop-action levers for adjustable ventilation
300 mm L | 60 mm dia. | 1.5 mm wall
20. Pipe Locks (L) — Qty: 100
Large clamp connectors that attach W-support pipes to the beam pipes
450 mm L | 80 mm dia. | 1.5 mm wall
21. Pipe Locks (M) — Qty: 100
Medium clamp connectors that attach W-support pipes to the beam pipes
400 mm L | 60 mm dia. | 1.5 mm wall
22. “U” Bolts — Qty: 100
Secure ridge and lateral pipes to the arch pipes
100 mm L | 80 mm dia. | 1.5 mm wall
23. Ridge Connectors — Qty: 173
Clamp fittings that connect the ridge pipes to the arch pipes
100 mm L | 65 mm dia.
24. Pipe Joints (L) — Qty: 10
Large T-fittings for irrigation pipe junctions
300 mm L | 60 mm dia. | 1.5 mm wall
25. Pipe Joints (M) — Qty: 10
Medium T-fittings for irrigation pipe junctions
300 mm L | 60 mm dia. | 1.5 mm wall
26. Poly Clips — Qty: 200
Secure the side vent poly film to the roll-up poly pipes
200 mm L | 30 mm dia. | 1.5 mm wall
27. Plugs — Qty: 200
Cap unused openings in the irrigation drip hose
30 mm L | 30 mm dia.
28. Rope — Qty: 20
Secures rolled-up side poly panels in windy conditions
2,000 ft | 2 mm dia.
29. Screws — Qty: 1,000
Standard hex-head screws for all frame connections
30. Sleeves — Qty: 14
End caps that cover open arch pipe tips to protect the poly cover
40 mm L | 65 mm dia. | 1 mm wall
31. Ground Ties — Qty: 100
Anchor stakes for securing shade tarps and ground-level poly
250 mm L | 48 mm dia. | 1.5 mm wall
32. Self-Tapping Screws — Qty: 42
Standard box of self-tapping screws for metal-to-metal connections
60 mm L | 15 mm dia.
33. Shipping Crate — Qty: 1
Heavy-duty wooden shipping crate
6.1 m L x 1.6 m W x 1.6 m H | approx. 3 tonnes
————————————————————————
Heavy Model: FEATURES
————————————————————————
✔ 26 fully trussed arches — one truss per arch — spaced 4 ft apart for maximum structural strength
✔ 6-foot sidewall clearance for easy equipment operation and worker comfort
✔ Dual 8’6″ sliding vehicle doors on both ends (2 per end, 4 total) — large enough for tractors and forklifts
✔ 6-foot roll-up vent system running the full length of both sides for superior airflow
✔ Insect mesh on both sides (100×10′ per roll) — blocks pests and seeds while maintaining ventilation
✔ 6-mil UV-stabilized poly film — main roof, roller side panels, lower panels, and end panels all included
✔ Wiggle-wire poly channel system for fast, tool-free cover installation and replacement
✔ Heavy-gauge galvanized steel throughout — foundation pipes anchor as solidly as concrete
✔ Wind pipes on both end walls to resist lateral wind loads on the gable ends
✔ Manual roll-up side vent rollers with stop-action levers for adjustable ventilation control
✔ Ground ties included for anchoring in high-wind or exposed locations
✔ Ships in a single heavy-duty crate (6.1m x 1.6m x 1.6m, approx. 3 tonnes)
————————————————————————
Heavy Model: SPECIFICATIONS
————————————————————————
Overall Length: 100 ft (approx. 30.5 m)
Number of Arches: 26, spaced 4 ft on centre
Sidewall Clearance: 6 ft (approx. 1,829 mm)
Door Size (per panel): 2,400 mm H x 1,200 mm W (8’6″ x 4′)
Door Configuration: Dual sliding doors on both ends — 4 doors total
Side Vent Height: 6 ft roll-up, full length both sides
Insect Mesh: 0.5 mm mesh, 100×10′, 2 rolls
Frame Material: Galvanized steel pipe
Main Arch Pipe: 60 mm dia. | 2.5 mm wall | 6,700 mm long
Foundation Pipe: 48 mm dia. | 1.5 mm wall | 1,200 mm long
Poly Film: 6-mil UV-stabilized | Main cover 100×60′ plus side, lower & end pieces
Shipping Crate: 6.1 m L x 1.6 m W x 1.6 m H | approx. 3 tonnes
————————————————————————
INCLUDED COMPONENTS
————————————————————————
1. Foundations — Qty: 52
Ground-anchor pipes, as strong as concrete and easy to install
1,200 mm L | 48 mm dia. | 1.5 mm wall
2. Arches — Qty: 26
Main structural arches holding the entire frame together, spaced 4 ft apart
6,700 mm L | 60 mm dia. | 2.5 mm wall
3. Ridges — Qty: 35
Longitudinal pipes that connect and align the arches at the peak
6,096 mm L | 60 mm dia. | 1.5 mm wall
4. Beams — Qty: 24
Transfer structural load from the arches down to the foundation pipes
6,500 mm L | 60 mm dia. | 1.5 mm wall
5. “W” Supports (L) — Qty: 48
Long diagonal supports connecting the arch peak to the beams, forming the truss
1,500 mm L | 48 mm dia. | 1.5 mm wall
6. “W” Supports (M) — Qty: 48
Short diagonal supports connecting the ridge of each arch to the truss system
1,200 mm L | 48 mm dia. | 1.5 mm wall
7. “W” Supports (S) — Qty: 48
Short diagonal supports providing additional truss reinforcement at each arch
1,000 mm L | 48 mm dia. | 1.5 mm wall
8. Poly Pipes — Qty: 10
Used with rollers and clips to roll up the side vent poly panels
6,096 mm L | 25 mm dia. | 1.5 mm wall
9. Wall Beams (L) — Qty: 4
Longest wall beam, also used for door frame construction
4,800 mm L | 60 mm dia. | 1.5 mm wall
10. Wall Beams (M) — Qty: 4
Structural sidewall framing and poly channel support
4,200 mm L | 60 mm dia. | 1.5 mm wall
11. Wall Beams (S) — Qty: 4
Short wall beams for lower sidewall framing
3,000 mm L | 60 mm dia. | 1.5 mm wall
12. Wind Pipes — Qty: 4
End-wall bracing pipes that resist lateral wind load on the gable ends
5,000 mm L | 48 mm dia. | 1.5 mm wall
13. Sliding Doors — Qty: 4
Dual sliding doors on both ends, 8’6″ tall and wide enough for vehicles
2,400 mm H | 1,200 mm W | 1.5 mm wall
14. Door Tracks — Qty: 4
Holds the sliding doors in position and guides them to open smoothly
5,000 mm L | 48 mm dia. | 1.5 mm wall
15. 6M “Poly” Film — Qty: 5 pieces
6-mil UV-stabilized poly film covering
Main roof: 100×60′ | Roller sides: 100×8′ (x2) | Lower: 100×2′ (x2) | Ends: 20×35′ (x2)
16. Poly Channels — Qty: 35
Frame-mounted channels that hold the poly film in place with wiggle wire
2,400 mm L | 48 mm dia. | 1.5 mm wall
17. Channel Connectors — Qty: 40
Connects two poly channel sections end-to-end
80 mm L | 6 mm dia. | 1.5 mm wall
18. Wiggle Wire — Qty: 40
Spring-lock wire that secures poly film inside the channels
2,400 mm L
19. Insect Net — Qty: 2
Fine mesh netting that blocks pests and seeds while allowing full airflow
100×10′ | 0.5 mm mesh
20. Standard Rollers — Qty: 4
Manual roll-up side vent rollers with stop-action levers for adjustable ventilation
300 mm L | 60 mm dia. | 1.5 mm wall
21. Pipe Locks (L) — Qty: 124
Large clamp connectors that attach W-support pipes to the beam pipes
450 mm L | 80 mm dia. | 1.5 mm wall
22. Pipe Locks (M) — Qty: 124
Medium clamp connectors that attach W-support pipes to the beam pipes
400 mm L | 60 mm dia. | 1.5 mm wall
23. “U” Bolts — Qty: 100
Secure ridge and lateral pipes to the arch pipes
100 mm L | 80 mm dia. | 1.5 mm wall
24. Ridge Connectors — Qty: 214
Clamp fittings that connect the ridge pipes to the arch pipes
100 mm L | 65 mm dia.
25. Pipe Joints (L) — Qty: 10
Large T-fittings for irrigation pipe junctions
300 mm L | 60 mm dia. | 1.5 mm wall
26. Pipe Joints (M) — Qty: 10
Medium T-fittings for irrigation pipe junctions
300 mm L | 60 mm dia. | 1.5 mm wall
27. Poly Clips — Qty: 200
Secure the side vent poly film to the roll-up poly pipes
200 mm L | 30 mm dia. | 1.5 mm wall
28. Plugs — Qty: 200
Cap unused openings in the irrigation drip hose
30 mm L | 30 mm dia.
29. Rope — Qty: 20
Secures rolled-up side poly panels in windy conditions
2,000 ft | 2 mm dia.
30. Screws — Qty: 1,000
Standard hex-head screws for all frame connections
31. Sleeves — Qty: 18
End caps that cover open arch pipe tips to protect the poly cover
40 mm L | 65 mm dia. | 1 mm wall
32. Ground Ties — Qty: 100
Anchor stakes for securing shade tarps and ground-level poly
250 mm L | 48 mm dia. | 1.5 mm wall
33. Self-Tapping Screws — Qty: 52
Standard self-tapping screws for metal-to-metal connections
60 mm L | 15 mm dia.
34. Shipping Crate — Qty: 1
Heavy-duty wooden shipping crate
6.1 m L x 1.6 m W x 1.6 m H | approx. 3 tonnes